You’ll need to have a specific plot and build in mind which needs to be supported by detailed plans, including a breakdown of material and labour costs and an indication of the energy standard you are building to.
• What deposit do I need for my self-build?
You need a 20% minimum deposit to buy the land and a further 15% – 20% of total build costs to start your build.